This is urgent! Twenty-three hours left, and we're still 32 minutes behind schedule!

5 seconds sound clip from the When Worlds Collide (1951) movie soundboard.

You can hear this line at 01:05:08.840 in the Blu-ray version of the movie.

Quote context

[...]

- I hate to remind you, but you said the doctor could fix everything.

- Oh, that's right, I did, didn't I?

- Well, let's weigh him.

- Incidentally, he's a she.

- Nine pounds, two ounces.

- Sure. Whatsis is gonna pinch-hit for a couple of plump chickens.

- This is urgent! Twenty-three hours left, and we're still 32 minutes behind schedule!

- Those posted to make the attempt to reach Zyra report without delay to Dr. Drake.

- My number! It's on! It's on the list! Julie, I'm on the list! Julie!

- Julie! Julie! My number! I'm on the list! Julie!

- Now, remember, if we delay the takeoff tomorrow as long as possible,

- Zyra's position will form a perfect orbit with ours.

[...]

When Worlds Collide (1951) Sound Clip

When Worlds Collide movie poster

Revisit the sci-fi classic "When Worlds Collide" with our collection of sound clips featuring iconic quotes from the 1951 film.

Actors: Richard Derr (David Randall), Barbara Rush (Joyce Hendron), Peter Hansen (Dr. Tony Drake), John Hoyt (Sydney Stanton), Larry Keating (Dr. Cole Hendron)

[Amazon link] #ad

Latest Movie Sound Bites

Thumb Immortal Combat (1994)
433 Sounds / Quotes
Thumb The Pebble and the Penguin
467 Sounds / Quotes
Thumb The Lost Weekend (1945)
658 Sounds / Quotes
Thumb Holiday (1938)
968 Sounds / Quotes

Poll

You are using film sounds: