We're still more than three hours behind schedule. Make it up! Hurry!
4 seconds sound clip from the When Worlds Collide (1951) movie soundboard.
You can hear this line at 00:59:06.385 in the Blu-ray version of the movie.
Quote context
[...]
- Attention, please. Less than six days left to Bellus. We're still falling behind schedule.
- Number five construction crew, report to the main bunker. Hurry.
- Now, this engine's all right. Let's try this one.
- It'll work out all right, Joyce.
- Everyone, only 79 hours left before the collision with Bellus.
- We're still more than three hours behind schedule. Make it up! Hurry!
- Worried?
- No.
- This ship is really put together. If anything can make it to the new world, this one will do it.
- How long would it take to learn this flight panel board?
- But Dr. Frye knows the inside and outside of every knob on the panel.
- He can operate it almost in his sleep.
[...]
