Because of your colonel's stubbornness, we are far behind schedule.

5 seconds sound clip from the The Bridge on the River Kwai movie soundboard.

You can hear this line at 00:37:11.822 in the Blu-ray version of the movie.

Quote context

[...]

- I could have you shot. Those prisoners who tried to escape, they were in your charge.

- I knew nothing about the escape.

- It does not matter. One must even respect those who tried.

- For a brief moment, between escape and death they were soldiers again.

- But it is insane to try and escape. Two soldiers shot, the third drowned. To what end? It was an escape from reality.

- There is your reality. This shows the position work should have reached by noon today. And this shows the position of actual progress.

- Because of your colonel's stubbornness, we are far behind schedule.

- That is not all.

- Enlisted prisoners sabotaged the work. Yes, I have seen it.

- I could have them all shot.

- Then who would build your bridge?

- Besides, are you sure it's sabotage? Perhaps the men don't work well without their own officers to direct them.

- My officers will direct them. Your officers will work beside them.

[...]

The Bridge on the River Kwai Sound Clip

The Bridge on the River Kwai Poster

Famous quotes from the 1953 movie The Bridge on the River Kwai, featuring sound clips of the best lines and sfx.

Actors: Alec Guinness (Colonel Nicholson), Sessue Hayakawa (Colonel Saito), William Holden (Commander Shears), Jack Hawkins (Major Warden)

[Amazon link] #ad

Latest Movie Sound Bites

Thumb Easy Money (1983)
718 Sounds / Quotes
Thumb Immortal Combat (1994)
433 Sounds / Quotes
Thumb The Pebble and the Penguin
467 Sounds / Quotes

Poll

You are using film sounds: