It's 3:05, Tigger! You're falling behind schedule!

4 seconds sound clip from The New Adventures of Winnie the Pooh - Party Poohper / The Old Switcheroo (S1E22).

You can hear this line at 00:02:32.896 in the Blu-ray version of the TV Series.

Quote context

[...]

- I've got to make a schedule. The key to giving a perfect party is an airtight schedule. Just follow your list of things to do, and the party will be a success.

- List? When a tigger gives a party, he just opens the door and hopes for the best. This way's no fun.

- Fun? Did you say fun? This is a party! Who said anything about fun?

- From 3:04 to 3:43, you'll bake cakes. Any questions, Pooh?

- Just one. How do you bake a cake?

- Very simple, Pooh. Add two egg whites, one cup of flour, two cups of sugar, dash of salt, pinch of vanilla, and then throw it in the oven and bake. Understand?

- It's 3:05, Tigger! You're falling behind schedule!

- Two egg whites. But they're all white.

- No, no, no, no, no! The decorations are wrong! This isn't a Halloween party!

- One cup of flowers...

- I'll save some time and sweep this dirt under the rug.

- Tigger! 3:21! You should be washing the windows! You're behind schedule!

[...]

The New Adventures of Winnie the Pooh Sound Clip

The New Adventures of Winnie the Pooh Poster

Funny quotes and catchphrases from The New Adventures of Winnie the Pooh TV Series, featuring short sound clips and sfx.

Actors: Jim Cummings (Winnie the Pooh), Paul Winchell (Tigger), Peter Cullen (Eeyore), John Fiedler (Piglet), Ken Sansom (Rabbit), Michael Gough (Gopher)

[Amazon link] #ad

Latest Movie Sound Bites

Thumb Immortal Combat (1994)
433 Sounds / Quotes
Thumb The Pebble and the Penguin
467 Sounds / Quotes
Thumb The Lost Weekend (1945)
658 Sounds / Quotes

Poll

You are using film sounds: