Tigger! 3:21! You should be washing the windows! You're behind schedule!
6 seconds sound clip from The New Adventures of Winnie the Pooh - Party Poohper / The Old Switcheroo (S1E22).
You can hear this line at 00:02:59.362 in the Blu-ray version of the TV Series.
Quote context
[...]
- It's 3:05, Tigger! You're falling behind schedule!
- Two egg whites. But they're all white.
- No, no, no, no, no! The decorations are wrong! This isn't a Halloween party!
- I'll save some time and sweep this dirt under the rug.
- Tigger! 3:21! You should be washing the windows! You're behind schedule!
- Piglet! It isn't an Easter party.
- Was that one dash of salt? Or one dish?
- Now, we haven't been washing behind our ears, have we?
- Tigger! 33:22! You're behind schedule again!
- It, uh... It's not a Christmas party, either?
[...]
